Chicago Heights Steel: measurement guides a system upgrade

Permanent monitoring exposed savings opportunities beyond leak repair. The reported result combines control, pipework, drying, storage and compressor improvements.

Read the complete original report

Reported project result

2.58MkWh saved per year

01 · Starting point

The operating challenge

Two separate compressor rooms each housed three compressors. Measurements from December 2015 to February 2016 established the baseline for the staged improvements.

02 · Implementation

What changed

The programme repaired leaks, changed dryers, connected the rooms and introduced central control. Later compressor replacements were also part of the overall investment.

03 · Results

The reported numbers

Reported annual energy savings
2,582,979 kWh
Reported annual cost savings
$215,037 USD
Total project investment
$240,139 USD
Total historical utility incentives
$188,714 USD

The publisher reports a 2.4-month payback. Total incentives include $177,714 for the equipment upgrade and $11,000 for leak repair. Results cover the complete project.