Molex: coordinated control for a growing plant

An audit helped a growing factory coordinate twelve compressors across four rooms. The published comparison shows air demand rising much faster than energy costs.

Read the complete original report

Reported project result

~$100kreported annual cost savings

01 · Starting point

The operating challenge

Independent machine controls created a pressure cascade. Too many compressors ran together, while operating problems were difficult to spot.

02 · Implementation

What changed

Peerless Energy recommended a connected plant header, an additional 3,000-gallon receiver and Airleader control. The existing Ethernet network linked the rooms and enabled central monitoring.

03 · Results

The reported numbers

Reported annual cost savings
Nearly $100,000 USD
Observed increase in air demand
43%
Observed increase in energy costs
5%
Reported unloaded share
1%

Historical project results, including a comparison with December 2010. Increased air demand and energy costs describe production growth, not an absolute energy reduction. Savings cover the system improvements.