Eversfrank: optimising compressed air for printing

The Alzey customer report describes 30 percent energy savings after compressed air optimisation, combining central control, lower operating pressure and an adapted compressor combination.

Initial situation

Four compressors operated at high pressure and required frequent servicing. The existing control system did not adequately match the printing plant's changing demand, and machine operating states were initially difficult to assess.

Measures and implementation

Airleader with web connectivity was installed in mid-2016 and subsequently tuned. Visualisation revealed frequent idle-running cycles. A variable-speed compressor was later purchased and the combination adapted. Operating pressure fell from 9.5 to 7.2 bar.

Documented results

Customer-reported energy savings
30% in the described project
Operating pressure
9.5 bar before; 7.2 bar afterwards
Idle running in the project summary
Below 1%
Control system payback
One month from energy and service savings, according to the customer

How to interpret the figures

The 30 percent result applies to this project and is not an average across Airleader installations. The 2019 report describes several changes and does not include a complete normalised measurement series. Reported payback concerns the control system, not the full investment at another plant.

What this means for your station

Analysing operating states can reveal whether a different compressor combination or operating range is needed. Assessing another printing plant starts with its own demand profile and measurements.

Source and report date

Der Betriebsleiter 7–8/2019, S. 10–11. Original report by Martina Laun. This summary follows the original report; it is not a new measurement.